A contractor agreed to renovate a bakery's kitchen for $80,000, and the specifications named a particular brand of stainless-steel countertops. The contractor instead installed a different brand of identical grade, thickness, and price; the owner noticed the substitution only after the job was finished, and everything else conformed perfectly. Displeased about the switch, the owner now refuses to pay the contractor anything at all for the renovation.
In the contractor's suit for payment, what is the most likely result?
- Option A. Correct answer. The contractor recovers the price minus any proven difference in value.Correct
- Option B. Incorrect answer. The contractor recovers nothing, having failed to install the exact brand named.
- Option C. Incorrect answer. The owner may reject the whole job, because the work was not a perfect tender.
- Option D. Incorrect answer. The owner must pay the full price with no deduction, since the breach was minor.